Shared work: 8 days and 24 days alone

One worker alone can finish a job in 8 days, and another alone can finish the same job in 24 days. Working together, how many days do they need?

Answer
6 days

Step-by-step

  1. 1 ÷ 8 = 0.125
    Work done per day by A
  2. 1 ÷ 24 = 0.0417
    Work done per day by B
  3. 1 ÷ (0.125 + 0.0417) = 6
    Combined time = 1 ÷ combined rate

Why it works

Working together, the two work rates add: each rate is 1 divided by that person's own time, so the shared time is 1 divided by the sum of the two rates.

Common mistakes

See this problem animated in CalcElf →